Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect hard / dense soil supplying of m.s. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. tor or ribbed bars (is :1786-1985) centering and shuttering for slabs, beams, lintels columns, trough with or without caps and base including propping and remove providing and laying in position of cement concrete design mix m-20 including leads of all constr
Sector: Water Resource Department