Details: b-14.39.2 dismantling wooden boards in lining of walls and partition excluding supporting members but including stacking within 50 meter lead:thickness above 10mm up to 25mm b-14.57 removing aluminium/gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by engineer-in-charge. g-4.2.13 - g.4.2.4 carriage of materials: building stone metal (grit and ballast etc.)for 20 km. deduct lead up to 50.00 mtr b-12.67 wall painting with royal play paint with various types of designs as approved of approved brand and manufacture to give an even shade including all scaffalding. two or more coats on new work including preparation of base with primer, putty lippy etc. complete in all respect. b-7.12 +7.14+7.15 providing and fixing 1st quality standard white, grey, ivory, fume red brown, light green, light blue and other light shades glazed tiles confirming to is : 13753
Sector: Power Sector