Details: dismantling kerb stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per mord specification clause 202. removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per clause 303.5.2 as per mord specification clause 302.3.11 production & supply of kandhal readymade cold bituminous patching mix in 50kg plastic lined, sturdy bags for repair of potholes in adverse climatic condition including the bituminous mix with a minimum of 5.6% mc-800 cutback bitumen (containing a suitable antistripping agent) by weight of mix and in strict conformance to gradation and other requirements such as 6-month storage life as per the attached specification, transportation with all lead and lift complete in all respects as per direction of engineer-in-charge. labour charges for placing and compacting kan
Sector: Urban Authority