Details: earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (morth specification clause 301 to 305).in ordinary soil mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper carriage of earth, sand, gravel, u/s kankar, lime, flyash, morrum, manure or sludge.add for each 1 km beyond 1st km(up to 05 km) providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =all up to plinth level 1:4:8 (1cement :4 course sand :8 graded stone aggregate 40 mm nominal size construction of un-reinforced without dowel bar plain cement concrete pavement over a prepared sub-base with 43 grade cement, coarse and fine aggregate conforming to is: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid wi
Sector: Urban Authority