Details: earthwork in excavation for foundation of structures as per drawing and technical specification i/c setting out, removing, spreading or stacking of spoils within a lead of 150m as directed and i/c trimming the sides of the trenches, leveling, dressing and ramming the bottom and back filling with approved material complete as per direction of the eng-in-charge. i. in all sorts of soil excluding marshy soil & rocks(soft or hard) by manual means. a) upto 3 m depth (iv) without pumping out water and shoring labour for laying 150mm to 200mm boulder soling i/c rough dressing hand packing and ramming down small pieces in the inter stices i/c rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth without rolling but i/c ramming. cement concrete with 30mm down graded shingles excl. shuttering.n.b. variety (a) 1:2:4 proportion ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if an
Sector: Zilla Parishad