Details: cement concrete with graded jhama khoa (30 mm size) excluding shuttering in ground floor and foundation. (a) 1:3:6 proportion , ref - pwd (bldg.)-2017, it. no. 1, page no.23 & 3rd corrigenda addenda dtd-04.06.18, p-9 & 10 building works (a) earth work,antitermite treatment 1.surface dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the within a lead upto 75 m as directed. , ref - supplying, spreading and compacting sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.note:- add cost at site of the materials to arrive at the complete rate. the compaction factor for dry, clean sand ma
Sector: Municipality