Details: cleaning and sweeping of roads, path and service lane etc on daily bass as per the direction of engineer and swept malba will be disposed of in vocal areal dustbin as per the direction of engineer in charge. disposal, removal of refuse/malba/garbage/sludge of all types from all dustbin/collection points in or around the scheme area and disposal of the same by mechanical transport i/c loading, unloading for 3km. lead up to dumping ground complete as per direction of engineer-in-charge. cleaning and desilting of gully trap chamber, including removal of rubbishmixed with earth etc. and disposal of same, all as per the direction ofengineer-in-charge. providing and fixing factory made precast rcc perforated drain covers,having concrete of strength not less than m-25, of size 1000 x 450x50mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectionalt.m.t. hoop bars, including providing 50 mm dia perforations @ 100 to125 mm c/c, including providing edge binding with m.s. flats
Sector: Urban Authority