Details: item no. 1: cleaning grass and removal of upto a distance of 50 meters out side the periphery of the area as directed. item no. 2: providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stone sands tone chips from approved source including cost of all materials, labour,machinary, handpacking / wedging stone chips,finishing etc.,complete with lead upto 1km and all lifts as directed.(for re-arrangine of pitching) item no. 3: providing casing embankment using selected pervious material from approved borrow areas (government acquired land) in layers including cost of all materials ,machinery , labour, all other operations such as collection of soil, spreadings oil inlayer of specified thickness, sortingout, breaking clods , levelling, sectioning edges/sides, watering , compacting each layer to density control of not less than 95 % of proctor density using vibratory compactor including cost of watere tc., complete with lead upto1km and all li
Sector: Water Resource Department