Description: Deployment of Chain Saw (18 to 22 ) along with an operator for tree cutting for 8 hr shift.(Including cost of fuel and consumables) complete all as per the instructions of Engineer-in-charge. Dismantling of Concrete platform/foundation by deploying tractor mounted air compressor unit including ch
Details: Deployment of Chain Saw (18" to 22") along with an operator for tree cutting for 8 hr shift.(Including cost of fuel and consumables) complete all as per the instructions of Engineer-in-charge2 2 Dismantling of Concrete platform Dismantling of Concrete platform/foundation by deploying tractor mounted air compressor unit including charges towards HOM, labour, etc. complete all as per special conditions and the instructions of Engineer-in-charge.3 3 Earthwork in surface excavation in ordinary soil for leveling and lowering the ground manually Earthwork in surface excavation in ordinary soil for leveling and lowering the ground manually and removing excavated earth, transporting the same outside PP unit, complete all as per special conditions and the instructions of Engineer-in-charge4 4 Providing and removing centering, shuttering, strutting, propping Providing and removing centering, shuttering, strutting, propping, etc. and removal of form work for columns foundation including cos
Sector: Mining