Description: Shifting, dismantling and re-arranging of DTC, 11 KV & LT lines passing through Block nos. B3, B6, B7 & B40A P2 and to provide power supply to IP sets (wherever existing) in 2000 MW Pavagada solar park on TTK basis
Sector: Renewable Energy