Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material tobe used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (item no 2.5 (ii)(b)in area of thorny jungle p.no. 9 vol 3 common sr for the year 2023-24).complete as per direction of engineer incharge;scarifying existing granular surface to a depth of 50 mm by mechanical means using hydraulic excavator ( as per vol iii pwd sr for 2023-24 p.no.15 i.no pwd 3.4 (ii) .complete as per direction of engineer incharge;providing casing embankment for breached / damaged portion of canal using approved pervious /semi-pervious soil in layers of 100 to 150 mm ( before compaction ) including cost of all materials, machinery, labour, all operations such as collection of soil, spreading soil in layer of specified
Sector: Irrigation