Details: indicative datasheet for advance work under assisted natural regeneration(anr) for the year 2024-25 hano. of pits-400 & size of pits-0.60 м3 no. of pbs-440 pits 44 trenchesno.particulars of the workextent:espacement: 5mx5m1qnty.rateperamount1100(a)rank growth to a width of 2 m. in the areas with thick under growth survey and demarcation of plantation boundary lines after clearing the72 rmtrs3.687.36km255 49sub2estimatebarbed wire fencing329 (b)aligning in the planting area and marking for pit (without staking) (aligning of pit in stagerred design)400 pits545.511000218.20excavation of pits of size 0.6 mtr. x 0.6 mtr. x 0.6 mtr. with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in hard29 (c) (ii)subsoll (400 pits x 0.60 m3 1 pit 0.216 186.40 .288.18124,898.755estimatecost of raising 8"x12" pb seedling, including 10% casualityreplacement484 seedl.25.50112.342.006ls/rqmiscellaneous, unforeseen &
Sector: Forest and Environment