Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(i) by mechanical means - b in area of thorny jungle complete, complete with all lead and lift and work shall be carried out as per the direction of engineer incharge of work ---- complete all lead and lift as per specification and as directed by the engineer incharge of work;cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all lead and all lifts. complete, the work shall be carried out as per the directions of the engineer in charge of work. ---- complete all lead and lift as per specification and as directed by the engineer incha
Sector: Irrigation