Details: engaging semi-skilled gardener for the maintance of gardens in colony etc;engaging unskilled mazdoor light for the maintance of chumary block etc;excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete.( as per vol 4 wrdo sr for 2023-24 p.no.104 i.no wrd 8.24);cleaning seftic tank of 50 users capacity as per details and instructions. (while cleaning septic tank all safety and precautionary measures to be taken,standard operating procedure to be adopted and pemsr act 2013 to be strictly followed)..( as per vol 4 bwssb sr for 2023-24 p.no.221 i.no:18.7);cleaning of water storage tank or sump by following method: (1) empty the tank/ sump and make it to near dry, (2) apply bleaching powder uniformally (@ tank capacity x 0.5 gms/litre) inside the tank/ sump and wait for one hour, (3) after one hour, clean/ rinse the tank/
Sector: Irrigation