Details: earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work, in ordinary/soft rock without blasting upto 1.5 m depth - overhead charges 10% added (vol 1, pg no 8, i no. 1.15.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the engineer in charge of work.;providing and fixing in position 25mm dia dowel bars precoated with antic
Sector: PWD